Mercedes Benz
Mercedes contracted CPR to completly remove the automated Body Shop machinery and processes from their Vance, Alabama facility. CPR handled this utilizing two 12 hour shifts, with over 120 trained personnel. The entire project was completed within the critical 21 day timeframe, without accidents or injury.

Smuckers Plant Consolidations
CPR's machinery movers completly closed the Smuckers facility in Salinas, California and consolidated the machinery into three of Smuckers other facilities located in Memphis, Kentucky, Washington and Smuckers main plant in Orrville, Ohio.

Hitachi
Relocated 864 overseas container loads of picture tube manufacturing lines from Greenville, SC to China. This project was achieved in only 12 weeks utilizing 136 field personnel. To complete the project it took: 1 project manager, 5 foremen, 34 carpenters building crates, 4 handling shipping documentation, 24 electricians, 12 pipefitters and 56 machinery movers.

Rit Dye
CPR's machinery moving teams completly relocated Rit Dye's manufacturing facilities which consisted of 5 floors of equipment to its new facility in Indianapolis, Indiana.

Freightliner
Upgrade to robotic line previously installed by CPR at the Freightliner Mount Holly, North Carolina facility involving removal of sections of the automated line and installation of updated robotic sections. Work had to be completed during shut down period of time. This included modification and fabrication of components on site. The work was completed ahead of schedule with accolades from the customer.

Hirata Engineering Corporation
Greenville, South Carolina - Disassembly of mechanical, electrical and pneumatic connections for a large screen television manufacturing plant. Work included rigging, packaging and crating of over 450 overseas containers with components including conveyers, chemical stations and process manufacturing facilities for shipment to facilities in Foshan, China.

Novozymes Biologicals, Inc.
Relocation of equipment from Milwaukee, Wisconsin to Salem, Virginia. Scope of work involved reconfiguring electrical and process piping for the disconnect and reinstallation of machinery. Also coordinated the shipping logistics from Milwaukee to Salem. Some of the machinery moved were high pressure boilers, freeze driers, fermentors, and centrifuges. A complete laboratory with walk-in cooler, autoclaves, incubators, and homogenizer, was also relocated.

LuK
Relocation of clutch and gear manufacturing lines from LuK's Ohio facility to Puebla, Mexico. Included machinery moving, crating and documentation for border crossing. CPR utilizes the same personnel to dismantle the equipment and reinstall the equipment wherever possible. Our experience proves that this speeds up the relocation process.

Cambridge Filter
Telocated textile filter manufacturing lines from Massachusetts to their new facility in Phoenix. Arizona.

Firestone Corporation
Henderson, Nevada – Performed BGE line relocation to Wellford, South Carolina including electrical and mechanical disconnect and demolition of process components. Work included rigging, packaging and crating of conveyers, control panels, pumps, cooling bay, etc. Wellford, South Carolina – Demolition of existing facility in order to retrofit process manufacturing line. Work included installation and assembly of process manufacturing line and connection of distribution panels and switchgear. Denver, Colorado – General relocation and new facility construction of process manufacturing line. Work included design and installation of laminator system, conveyers, chillers and QC laboratory. Constructed concrete structures for facility retrofit of plant components.

Copeland Corporation
Sydney, Ohio – Disconnected an entire production line, including machinery, conveyors, and robotics. Relocated half of the line to Lebanon, Missouri, and the other half to Rayong, Thailand. Lebanon, Missouri – Placed and reconnected machinery, creating a new production line. Scope involved electrical and piping reconnection for machinery, conveyors, panel boxes, and robotics. Performed modifications on site during project. Rayong, Thailand – Placed and reconnected machinery for creation of the Summit Assy line. Scope involved electrical and piping reconnection for machinery, conveyors, and panel boxes. Adjusted production line configurations for modifications.

Siemens Westinghouse Power Corporation
Mulheim, Germany – Turnkey relocation of equipment from Mulheim Germany to Fort Payne, AL and Charlotte, NC. Including crating, shipping, precision laser alignment and modification of electrical from European to American voltages. Charlotte, North Carolina – Installed a coil insertion machine, which we relocated from Mulheim, Germany. Also relocated two ovens and machine tools from Winston-Salem, NC. Scope of work involved setting the machinery and electrical and piping reconnection. Fort Payne, Alabama - Relocated Equipment from Mulheim, Germany. Scope of work involved setting machinery and electrical and piping reconnection.
Next Last    ^TOP
   
Commercial Plant Relocators, Inc. CPRGLOBAL.COM
Info@cprglobal.com
P.O. BOX 2571 ANDERSON SOUTH CAROLINA 29622-2571   USA
Voice (864) 646-3133 Fax (864) 646-6780 © 2008 Commercial Plant Relocators Design by Flatworks
Powered by ECN